_Among today's major challenges

Mineral
25%

Shortage of critical metals

A mineral deficit of 25% could slow down energy transition targets by 2030.

_Ginger can assist you with all your mining and quarrying projects, from site identification to site closure

  • Exploration
  • Estimating mineral resources
  • Hydrogeological studies
  • Mining studies
  • Environmental and social impact assessments
  • Advice and support for the Mining Administration
  • Site rehabilitation
  • Project management assistance: mine opening - restoration
AP Mine

_Our areas of expertise

_Exploration

Ginger's in-depth knowledge of multiple mineral parageneses and exploration techniques enables us to define tailor-made programmes to optimise exploration campaigns.

_Modelling and simulation

Geological modelling solutions tailored to each project to quantify and plan the mining of deposits. Certification of mineral resource estimates in accordance with international standards and norms: JORC, NI43-101.

_Geological infrastructures

We assist governments and multilateral banks with geological mapping, geochemical surveys, geotechnical mapping and the implementation of geological information systems.

_Mine engineering

Supporting clients in their choice of mining methods, equipment sizing and selection, mining infrastructure engineering as well as the development, implementation and optimisation of mining strategies.

_The expert's point of view

Sylvain PETIT

"As with other sectors, industry is undergoing radical change: climate change, rising energy costs, the return to local production to control supplies, the desire to limit its impact on different environments - the challenges are many and vital to the long-term survival of companies and of the planet.

The Ginger Group anticipated these changes and positioned itself as a major player in this new industry.

The Ginger Group's support for more sustainable industries includes thinking about the building site from the outset, prioritising the redevelopment of strategically located brownfield sites, building sustainably using low-carbon materials, anticipating, measuring and minimising impacts, and using as much renewable energy as possible."

Sylvain Petit
Director of Contaminated Sites and Soils, Ginger BURGEAP
Yelena COLSON

"Geological studies are the first and most important step in developing mineral resource deposits. Ginger SOFRECO has been working in this field for 30 years and has built up solid experience in carrying out exploration campaigns and estimating mineral resources. 
Our teams' experience in the mining sector and the methodologies developed by Ginger SOFRECO enable us to offer our clients the solutions that best fit their needs."

Jelena Colson
Director of the Mine Engineering Department, Ginger SOFRECO
Bruno MOREAU

Sugar and its by-products

"With experience in more than 70 sugar factories present in more than 25 countries, Ginger SOFRECO has a thorough understanding of the value chain in the sugar and by-products industry and provides services ranging from the design to construction and management of sugar complexes. 

The sugar industry is large and demanding, requiring the development of several thousand hectares at very high investment costs. As an engineering consultancy firm, Ginger SOFRECO has often played a pioneering role by applying innovative technical solutions, as in the past for the Borotou sugar complex in Côte d'Ivoire and, more recently, for the White Nile complex in Sudan. 

The interest and excitement of these agribusiness projects lies in the optimisation of complex processes involving all the unitary operations of chemical engineering and in the management of multidisciplinary teams involving all State bodies"

Bruno MOREAU
Agri-food engineer, Ginger SOFRECO

_They trust us

Focus

_40 years of experience in the sugar industry

With 40 years of experience in more than 25 countries, Ginger SOFRECO is a key actor in engineering consulting for the sugar industry.

We assist our clients in the implementation of their projects by tackling all the issues involved - irrigation, agriculture, water management, processes, markets, etc. Based on the characteristics of the plant raw material (sugar cane, sugar beet, molasses, bagasse, etc.), seasonality and available resources, we provide you with the best engineering and consultancy services to achieve your objectives. 

Thanks to its experience, Ginger SOFRECO has forged solid relationships with numerous European, Asian, South African, Australian and South American public and private partners.

sucre

_A wide range of projects

PHOS-3 project, Saudi Arabia - MA'ADEN

The PHOS-3 project involves the development of an open pit phosphate mine to produce approximately 11 Mt of ore per annum. Ginger SOFRECO was commissioned to carry out an exploration campaign to estimate resources using the JORC code, followed by a mining survey. This mining survey enabled us to draw up a pre-mining plan and a blasting plan. The mining survey enabled us to draw up a pre-mining plan and a blasting plan. Our teams also took the measurements needed to calculate dilution, losses, mechanical parameters and fragmentation. Our geology and mining team then used this data as the basis for the feasibility study.

Image ma'Aden

Development of the Wadi Sawawin iron deposit, Saudi Arabia - NEOM

Ginger SOFRECO was responsible for designing and supervising the exploration campaign followed by a JORC-compliant mineral resource estimate for the Wadi Sawawin iron deposit in Saudi Arabia.
The work carried out included core drillings/destructive drilling (DD), reverse circulation drilling (RC), the creation of surface sampling trenches, 1:5000 field mapping, satellite imagery analysis, core cutting and geochemical and magnetic susceptibility analyses of the samples produced. Ginger SOFRECO was responsible for defining the drilling operations, maintaining quality assurance (QA/QC), sampling and the geological analysis of the core samples.
The data obtained was used to produce a geological model and estimate the mineral resources of the deposit.

neom

Assessment of the Boké bauxite ore reserves - Compagnie des Bauxites de Guinée (CBG)

Ginger SOFRECO provided expertise and technical support to the CBG mining team for reconciling resource data, reserve data and annual production data, updating the various Life Of Mine Plans (LOMP) and the status of the operation's ore reserves in accordance with the JORC code.
Ginger SOFRECO's services include cash flow analysis, technical and economic risk analysis, technical recommendations and a study of the impact of possible investments on the cut-off grade, the various Life Of Mine Plans (LOMP) and the status of the ore reserves.

Compagnie des Bauxites de Guinée

Project management assistance for the commissioning of the Al-Khabra mine, Saudi Arabia - MA'ADEN

Ginger SOFRECO provided technical support and project management assistance for the commissioning of the Al-Khabra phosphate mine with a capacity of 15 Mt per year. This operation is part of the client's vast business complex which includes a phosphate operation, an enrichment plant and plants for the production of sulphuric acid, phosphoric acid and purified phosphoric acid, sodium tripolyphosphate (STPP) and dicalcium phosphate (DCP) at Umm Wu'al in northern Saudi Arabia, and ammonia, NPK and diammonium phosphate (DAP) production units at Ras Al Khair on the Arabian Gulf.

The services provided by Ginger SOFRECO include engineering services (detailed mining plan, choice of mining contract strategy, study of the mine maintenance area, pre-commissioning drilling tests, blasting and fragmentation methods), project management assistance (supervision of grade control work, estimation of resources and reserves in accordance with the JORC code, technical review of the mine maintenance area, mining facilities and ammonium nitrate storage) and operational support services (support during commissioning, recruitment and training, operations and maintenance).

Ma'aden 2

Audit of mineral resource reports - Société des Mines de Tontouta (SMT)

  • Analysing the mining method and estimating the mineral resources of nickel ore in lateritic deposits
  • Auditing mineral resource estimation methods and procedures against the JORC standard
  • Identifying areas for improvement and preparing recommendations
     
Société des Mines de Tontouta

Long-term mining plan update - Vale New Caledonia

The purpose of the mission is to define a cut-off grade and the optimal pit limit for the Goro project (New Caledonia). Vale New Caledonia is a mining company (limonite and saprolite) that produces nickel and cobalt.

  • Updating mine design criteria
  • Pit optimisation and analysis of different production scenarios
  • Mine design and production schedule
Vale Nouvelle-Calédonie
Demande de devis